KESCO Net Metering in Kanpur: How It Works

By Abul Hassan, Owner, Indus Solar Solutions, Kanpur

Updated · 3 min read

Short answer

A net meter records units you take from the KESCO grid and units your panels send back. Each month you are billed only for the difference. Spare units carry forward to later months, and whatever is left at the end of the financial year is paid at about ₹3 a unit. That is roughly half what a unit costs you to buy, so size the system to your own use.

What the net meter does

Your normal KESCO meter is swapped for a bi-directional (net) meter. It keeps two readings: import, the units you draw from the grid, and export, the units your panels push into the grid when they make more than the house is using.

Panels produce most between about 10am and 3pm. If nobody is home, most of that goes out as export. In the evening you import. Net metering lets the daytime export pay for the evening import, so you don't need a battery to use your own solar power.

How your monthly bill is worked out

  1. KESCO subtracts export from import for the month.
  2. If import is higher, you pay for the difference at the normal slab rates: ₹5.50 a unit up to 150 units, ₹6.00 up to 300 and ₹6.50 above that.
  3. If export is higher, you pay no energy charge and the spare units are banked as a credit for the next month.
  4. The fixed charge of ₹110 per kW of sanctioned load and the 5% duty apply every month either way.
Example month: 3kW system, 3kW sanctioned load, KESCO urban domestic tariff
Import 400, export 325Import 250, export 325
Net units75 billed75 banked as credit
Energy charge₹413₹0
Fixed charge₹330₹330
Duty (5%)₹37₹17
Billabout ₹780about ₹347

The full before-and-after bill for a 400-unit home is in is rooftop solar worth it in Kanpur.

What happens to spare units at year-end

Banked credit rolls over month to month until the financial year closes on 31 March. Credit left over then is paid out, not carried into the next year.

Since 5 July 2025, UPERC's rooftop solar rules set that payout as the average tariff of recent large solar auctions plus a 25% incentive. In practice that is about ₹3 a unit. A unit you use yourself saves ₹5.50–6.50, so it is worth about twice a unit you export and never claw back.

This is why monsoon months matter. Credit banked from March to June helps cover July to September, when output falls. Sizing to your yearly average, not your summer peak, keeps that credit in use instead of being paid out at ₹3.

Sizing rules that follow from this

  • Average the units on your last 12 KESCO bills. A 1kW system makes about 108 units a month in Kanpur, so divide your average by 108 for a first estimate of size.
  • Your system generally can't be bigger than your sanctioned load. If you need more, apply to KESCO for a load increase before applying for solar.
  • The fixed charge rises with sanctioned load, at ₹110 per kW each month. Don't raise your load further than the system needs.

Our solar calculator runs this sizing for you from your bill.

Applying for the net meter

For homes, the net meter is applied for through the PM Surya Ghar portal after installation, as step 4 of the subsidy process. KESCO inspects the system, fits the meter and commissions it, usually 2 to 4 weeks after you apply. The whole sequence is in our PM Surya Ghar application guide.

Registration fees and meter charges are set by KESCO and have changed over time. Ask your installer to put the current figures in the quote, so you aren't surprised at commissioning.

Common questions

Do I need a battery with net metering?
No. The grid acts as your store: daytime export is credited against evening import. A battery is only worth adding if you want backup during power cuts.
Does net metering work during a KESCO power cut?
No. An on-grid inverter switches off when the grid fails, so linemen working on the line are not put at risk. You need a hybrid inverter with a battery for backup.
Is unused credit carried into the next financial year?
No. Credit carries forward month to month until 31 March, and what is left is then paid out at the year-end compensation rate of about ₹3 a unit.

Sources

Subsidy amounts and tariffs are set by the government and can change. Check the official portals before you decide.